Turnaround at Vermilion's Garijp Treatment Centre


In July 2011, Hertel was commissioned by Vermilion to perform insulation and scaffolding work during the turnaround of its Garijp treatment facility.

Vermilion produces natural gas at various sites on the mainland, throughout the province of Friesland and Noord-Holland. The produced is transported by a pipeline gathering system to three gas treatment facilities. At these facilities the gas is conditioned prior to transfer to Gasunie, the operator of the national gas distribution system.

Integrated and fast approach
Vermilion and Hertel drew up a detailed scaffolding plan together, so that all the scaffolding was ready before the start of the turnaround project. Around 10,000 m³ of scaffolding was constructed. It was known in advance that the insulation work (mostly cold insulation) would have to be carried out in a very short time frame. A thorough action plan, work preparation and scheduling ensured that the insulation work could be performed flawlessly. The final work was completed in early December, to Vermilion's full satisfaction.

Monday 23rd of January 2012, 09:19:46 AM GMT

Share this...






Keep in touch


Forename

Surname

Email




Media Contacts


Peter Bassa
peter.bassa@hertel.com

Follow hertel_global on Twitter

Full asbestos licence award for Hertel


Hertel in the UK has been awarded a full three year asbestos licence renewal following a strict assessment.

Hertel welcomes new Supervisory Board Member


We are pleased to announce that as per 28 November 2011 Mr Wim van Vonno has been appointed member of the Supervisory Board of Hertel Holding BV.

Hertel awarded prestigious safety award


Hertel has been presented with a British Safety Council Sword of Honour at an awards ceremony at the historic Goldsmiths’ Hall, London.